Teledyne T200U-NOy Manual de usuario Pagina 25

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 42
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 24
07303C DCN6646 23
6.0 MAINTENANCE
6.1 Maintenance Schedule
The schedule for preventative maintenance is presented in Table 6 below.
Qualified Maintenance Personnel Required
Table 6 Preventative Maintenance Calendar
Item Maintenance Interval
Zero/Span Calibration Annually or after maintenance or repairs
Zero/Span Checks Daily
Particulate Filter Weekly as needed
Ozone Flow Check every year and replace o-ring and orifice in reaction
cell
Ozone Dryer Filter-DFU Replace every year
Reaction Cell Window Clean annually or as necessary (refer to T200 Manual
Sample Flow Check every 2 months
Converter Check efficiency every 2 months
Pneumatic Lines Check every 3 months
Factory Calibration Calibrate each year or after repairs
Leak Check Check every 6 months
Replace bypass flow orifices Every year / as needed
Rebuild 501Ybypass pump Every year (check part number on pump label)
Vista de pagina 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 41 42

Comentarios a estos manuales

Sin comentarios